Informing a Client About a Project Delay

إبلاغ العميل بتأخر المشروع

اضطرت صوفيا إلى إخبار عميلها بتأخر المشروع. ورغم توترها لأن العميل كان يتوقع العمل يوم الجمعة، اتصلت به صباح الاثنين وشرحت له بصدق أن أحد أعضاء الفريق مرض وأن ملفًا مهمًا فُقد، لذا احتاج الفريق ثلاثة أيام إضافية. اعتذرت واقترحت موعدًا جديدًا ووعدت بتحديثات يومية، فتفهّم العميل الموقف، وكان المشروع جاهزًا يوم الأربعاء.

2 دصوت + نصشاركه EveryLevel Editorsتمت المراجعة

ابدأ الدرس

مشاركة هذه الصفحة

يستطيع كل من لديه الرابط فتح هذه الصفحة. لا حاجة إلى حساب لقراءتها.

النص الكامل

  1. 1Sofia had to tell her client about a delay in the project.
  2. 2She felt nervous because the client was expecting the work on Friday.
  3. 3On Monday morning, she called him and explained the problem honestly.
  4. 4One of the team members was ill, and a key file was lost, so the group needed three more days to finish.
  5. 5Sofia said sorry for the change and offered a new date.
  6. 6She also promised to send a short update every day so the client could see the progress.
  7. 7The client was not happy at first, but he understood.
  8. 8He thanked Sofia for telling him early instead of waiting until Friday.
  9. 9In the end, the project was ready on Wednesday, and the client was pleased with the result.

عبارات هذا الدرس

  • had to tellwas required to inform
  • about a delayconcerning a situation where something is late
  • felt nervouswas anxious or worried
  • was expectingwas anticipating that something would happen
  • On Monday morninga time phrase saying when something happened
  • called himphoned a male person
  • explained the problem honestlydescribed the problem in a truthful, open way
  • One of the team membersa single person belonging to the team
  • a key file was lostan important file went missing
  • needed three more daysrequired an additional three days
  • said sorryapologized
  • offered a new datesuggested another date
  • promised to sendsaid she would definitely send
  • a short updatea brief message with news
  • see the progressnotice how the work is moving forward
  • was not happyfelt upset or dissatisfied
  • at firstin the beginning, before things changed
  • but he understoodhe accepted or grasped the reason in the end
  • thanked Sofia for telling him earlyexpressed thanks because Sofia informed him soon
  • instead of waitingrather than delaying
  • until Fridayup to Friday, when the waiting would end
  • In the endfinally; after everything happened
  • was pleased withwas happy or satisfied about something
  • the resultthe final outcome or effect of the work

بعد هذا الدرس يمكنك…

  • افهم الجمل الـ9 كلّها واعرف لماذا استُخدمت كل عبارة
  • استخدم “had to tell” و“about a delay” عندما تتحدّث أو تكتب بالإنجليزية

هل لديك نص مشابه؟ الصق رسالة من بريدك أو ملاحظاتك لتحوّلها إلى درس بالطريقة نفسها.

ثبّت EveryLevel على هاتفك

المتابعة عبر Google

Choose a Google account in the new window. Cancel here anytime.

المتابعة عبر Google

Choose a Google account in the new window. Cancel here anytime.