Informing a Client About a Project Delay

如何告知客户项⁠目⁠延⁠期

索菲亚不得不告诉客户项目延期了。客户原本以为周五就能拿到成果,她心里很紧张,但还是在周一早上给他打了电话,如实说明有位团队成员生病、一个关键文件丢失,因此还需要三天时间。她道了歉,提出了新的交付日期,并答应每天汇报进展;客户表示理解,项目也在周三顺⁠利⁠完⁠成⁠。

2 分钟音频 + 文本EveryLevel Editors 分享已审核

开始学习

分享这一页

任何拿到链接的人都能打开这一页,无⁠需⁠账⁠号⁠。

全文

  1. 1Sofia had to tell her client about a delay in the project.
  2. 2She felt nervous because the client was expecting the work on Friday.
  3. 3On Monday morning, she called him and explained the problem honestly.
  4. 4One of the team members was ill, and a key file was lost, so the group needed three more days to finish.
  5. 5Sofia said sorry for the change and offered a new date.
  6. 6She also promised to send a short update every day so the client could see the progress.
  7. 7The client was not happy at first, but he understood.
  8. 8He thanked Sofia for telling him early instead of waiting until Friday.
  9. 9In the end, the project was ready on Wednesday, and the client was pleased with the result.

本课词组

  • had to tellwas required to inform
  • about a delayconcerning a situation where something is late
  • felt nervouswas anxious or worried
  • was expectingwas anticipating that something would happen
  • On Monday morninga time phrase saying when something happened
  • called himphoned a male person
  • explained the problem honestlydescribed the problem in a truthful, open way
  • One of the team membersa single person belonging to the team
  • a key file was lostan important file went missing
  • needed three more daysrequired an additional three days
  • said sorryapologized
  • offered a new datesuggested another date
  • promised to sendsaid she would definitely send
  • a short updatea brief message with news
  • see the progressnotice how the work is moving forward
  • was not happyfelt upset or dissatisfied
  • at firstin the beginning, before things changed
  • but he understoodhe accepted or grasped the reason in the end
  • thanked Sofia for telling him earlyexpressed thanks because Sofia informed him soon
  • instead of waitingrather than delaying
  • until Fridayup to Friday, when the waiting would end
  • In the endfinally; after everything happened
  • was pleased withwas happy or satisfied about something
  • the resultthe final outcome or effect of the work

学完你能…

  • 听懂所有 9 句,知道每个词组为什么⁠这⁠么⁠用
  • 用英文表达自己的意思,记得用上“had to tell”和“about⁠ ⁠a⁠ ⁠delay⁠”

手头也有类似的英文?贴上自己的邮件或笔记,也能做成这⁠样⁠的⁠课⁠。

把 EveryLevel 装到手机上

用 Google 继续

在新窗口里选择 Google 账号。可随时在这⁠里⁠取⁠消⁠。

用 Google 继续

在新窗口里选择 Google 账号。可随时在这⁠里⁠取⁠消⁠。